Procedure for Applying AlproJet to Suction System;
Daily – AlproJet D
Mix 1 litre of AlproJet D as a 5% solution (50ml of AlproJet D to 950ml of warm water 40o), in a suitable container.

Lift both suction hoses from their holders, with the valves open and solids strainer in place; introduce the ends to the solution such that a mixture of air and solution is taken up. About 300ml should be drawn up, the hoses should then be returned to their holders and allowed to sit for 5 minutes. This process allows the AlproJet D to react with the protein coating within the interior of the hoses.

Repeat the process of drawing up 300ml of solution as described above allowing a further 5 minute soaking.

Draw up the remainder of the solution and allow to soak again for 5 minutes.

Finally, flush the system with clean water.

If more than one surgery is being processed, use the soaking time to dose the next unit.

This process should be performed on a Daily Basis.

Weekly – AlproJet W
AlproJet W is applied in the same manner as above but on a Weekly Basis, or more frequently there is a high protein build-up or foaming occurs. After completing the AlproJet W treatment, the suction hoses may be removed from the unit and left soaking in clean water until the next use.

Please note; This is a two part cleaning process, both the daily and weekly procedures must be followed to complete the decontamination process.

Procedure for Applying AlproJet to Suction System; Daily - AlproJet D Mix 1 litre of AlproJet D as a 5% solution (50ml of AlproJet D to 950ml of warm water 40o), in a suitable container. Lift both suction hoses from their holders, with the valves open and solids strainer in place; introduce the ends to the solution such that a mixture of air and solution is taken up. About 300ml should be drawn up, the hoses should then be returned to their holders and allowed to sit for 5 minutes. This process allows the AlproJet D to react with the protein coating within the interior of the hoses. Repeat the process of drawing up 300ml of solution as described above allowing a further 5 minute soaking. Draw up the remainder of the solution and allow to soak again for 5 minutes. Finally, flush the system with clean water. If more than one surgery is being processed, use the soaking time to dose the next unit. This process should be performed on a Daily Basis. Weekly - AlproJet W AlproJet W is applied in the same manner as above but on a Weekly Basis, or more frequently there is a high protein build-up or foaming occurs. After completing the AlproJet W treatment, the suction hoses may be removed from the unit and left soaking in clean water until the next use. Please note; This is a two part cleaning process, both the daily and weekly procedures must be followed to complete the decontamination process.